Operating Manual


Tandem TurboDraft Operations
(* Minimum required pump size: 500 GPM)
  • Set up and establish the first TurboDraft unit as discussed under "TurboDraft Set-Up/Operation" on pages 4-6. Refill the tank.*
  • Lay out the second unit connecting its 2-1/2 inch charge line to a 2-1/2 inch outlet and its 5 inch supply line to the truck's officer side steamer connection.**
  • Using the first TurboDraft as a supply, charge the second unit's 2-1/2 inch supply line.
  • Once the second unit's 5 inch line has been bled free of air, slowly open its suction valve.
  • Begin water supply operations by slowly opening the required discharge valves.

*The unit with the longest 5 inch line should be set up first and connected to the driver side steamer/intake.

**The second steamer must be fitted with a suction valve and air bleeder. A front or rear suction may be used in lieu of the other steamer if a suction of hard sleeve is installed between the 5 inch hose and the suction connection. This is necessary to prevent premature collapse of this line.

<< Previous Page

Next Page >>

 

2510 Metropolitan Drive
Trevose, PA 19053 USA
Tel: (215) 639-0900
Fax: (215) 639-1597
email:
turbodraft@s-k.com

 

© 2000-2003 Schutte & Koerting All rights reserved.